The baseline values are the grayed-out options you see when you step through the various optimization areas. Each of them has a cost associated which we sum together to get the total baseline cost. Then we simply subtract this from the sum of the costs for a given set of design options.
How is the cost premium calculated?
It is the "Total Cost" - "Baseline Cost"